Login  |  Register          Free Newsletter Subscription
Zibb
Subscribe to Logistics Management
Email
Print
Reprint
Learn RSS

Reduced-maintenance battery cuts costs

Staff -- Logistics Management, 7/1/2005

The EM-Line battery has been engineered to increase the time between watering intervals, even in rigorous industrial lift truck applications. An increased water-storage capacity allows the battery to operate for three months or longer without watering, compared to conventional flooded batteries that require weekly or bi-weekly watering.

The principal benefits include the reduction of maintenance costs, labor, and the possibility of watering errors. Ranging from 12 through 48 volts in 80 and 120 ampere-hour (AH) sizes, the EM-Line is ideal for the replacement of original battery equipment as well as for new applications.

C&D Technologies Inc. 800-543-8630 www.cdtechno.com

Email
Print
Reprint
Learn RSS

Talkback

We would love your feedback!

Post a comment

» VIEW ALL TALKBACK THREADS

Sponsored Links

 
Advertisement

More Content

  • Blogs
  • Webcasts

Blogs


Sorry, no blogs are active for this topic.

View All Blogs RSS
Advertisements





Logistics Management NEWSLETTERS

Click on a title below to learn more.

Logistics Preview (Monthly)
This Week in Logistics (Weekly)
Supply Chain & Logistics Tech Briefs (Monthly)
Resource Center E-Alert (Monthly)
About Us   |   Advertising Info   |   Site Map   |   Contact Us   |   FREE Subscription   |   RSS
© 2008 Reed Business Information, a division of Reed Elsevier Inc. All rights reserved.
Use of this Web site is subject to its Terms of Use | Privacy Policy
Please visit these other Reed Business sites