Subscribe to our free, weekly email newsletter!


House T&I Committee set to introduce Water Resources Reform and Development Act of 2013

By Jeff Berman, Group News Editor
September 11, 2013

Later today, the House Transportation and Infrastructure Committee and its Subcommittee on Water Resources and Environment will introduce the Water Resources Reform and Development Act of 2013 (WRRDA).

Committee officials said that through this type of water resources legislation, Congress authorizes the U.S. Army Corps of Engineers to carry out its missions to develop, maintain, and support the Nation’s vital port and waterways infrastructure needs, and support effective and targeted flood protection and environmental restoration needs.

And while Congress has passed this legislation every two years to provide clear direction to the Administration and the Corps, a bill has not been signed into law since 2007. 

“The Water Resources Reform and Development Act will be one of the most policy and reform focused measures of its kind in the last two decades,” read a House T&I Committee statement.

“In a video message, House T&I Chairman Rep. Bill Shuster (R-Pa.) said that U.S. ports and waterways are highly essential, especially when considering that 99 percent of the goods the United States trades, sell, and import around the world go through U.S. ports, representing $1.4 trillion worth of goods every year.

But he pointed out that comes with a caveat, considering that the United States’ critical infrastructure is aging and the process for updating it is slow, costly, and filled with red tape.

“Something needs to be done, but Congress has not passed a water bill in six years, and as a result our country is losing its competitive advantage,” he said. “Meanwhile, the bureaucracy rides on as government-mandated studies have been going on for more than 15 years with no limit on spending, wasting billions of taxpayers’ dollars and valuable time. We are literally studying our infrastructure to death, but we can do something about it with strong reforms and shortening the review time to three years. That is exactly what this bill does. It also puts a cap on how much we can spend on these studies.”

In May, the U.S. Senate approved S. 601, the Water Resources Development Act (WRDA) of 2013 by an 83-14 margin.

This legislation provides critical flood protection for communities across the country, maintains the flow of commerce, and will create up to 500,000 new jobs, according to the Senate’s Environment and Public Works (EPW) Committee.

The Senate version contains various provisions that stand to have a direct impact on shippers, including:
-project authorization for 18 projects that address all major mission areas of the Corps of Engineers, including flood risk management, navigation, hurricane and storm damage risk reduction, and environmental restoration, with an annual benefit topping $690.3 million;
-project delivery reforms that establish a new program to promote levee safety and improve inland waterways project delivery, among other efforts; and
-address the surplus of the Harbor Maintenance Trust (HMT) Fund by ensuring all revenues will be spent for port maintenance and not impact other important Corps of Engineers projects

About the Author

Jeff Berman headshot
Jeff Berman
Group News Editor

Jeff Berman is Group News Editor for Logistics Management, Modern Materials Handling, and Supply Chain Management Review. Jeff works and lives in Cape Elizabeth, Maine, where he covers all aspects of the supply chain, logistics, freight transportation, and materials handling sectors on a daily basis. .(JavaScript must be enabled to view this email address).


Subscribe to Logistics Management magazine

Subscribe today. It's FREE!
Get timely insider information that you can use to better manage your
entire logistics operation.
Start your FREE subscription today!

Recent Entries

As was the case for the second quarter, third quarter earnings results for publicly-traded less-than-truckload (LTL) carriers are again strong. Signs of solid earnings results from carriers that have posted earnings to date include tonnage increases, gains in weight per shipment and average daily shipments, higher yield, and revenue per hundredweight.

While the holiday season is known to bring good tidings and cheer to all, it may also come with another thing that is not so pleasant: higher rate freights. That was the thesis of a commentary written by Mark Montague, industry pricing analyst and chief market-watcher for DAT, a Portland, Ore.-based subsidiary of TransCore.

Earlier this week, FedEx said it is expanding its International First service for early deliveries with the addition of 31 new origin countries, which will bring the total number of origin markets for the service to 97.

Monday, December 22 is pegged as UPS's peak delivery day, as the company expects to deliver more than 34 million packages that day, adding that it expects to see six days in December top last year’s peak shipment day delivery record of 31 million packages.

The time has come again for less-than-truckload (LTL) general rate increases (GRI), with various carriers recently announced their respective rate hikes in recent days.

Article Topics

News · WRDA · All topics

Comments

Post a comment
Commenting is not available in this channel entry.


© Copyright 2013 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA