Subscribe to our free, weekly email newsletter!


Too much slack in supply chain means softer Japanese recovery

By Patrick Burnson, Executive Editor
April 07, 2011

Analysts for IDC Manufacturing Insights and IDC Retail Insights, report that Japanese manufacturers face severe disruptions across several value chains in the coming months.

According to IDC group vice president, Bob Parker, Toyota is losing $80 million per day largely due to several strategic suppliers being located in the Northeast.

“Even if plants were not damaged, power has been unreliable,” he said in a recent blog post. “General Motors, who also relies on suppliers in northern Japan for global production, has cut overtime at its Korea plants in anticipation of parts shortages and expects the impact to reach other parts of the world.  GM reported that the complete picture wouldn’t be known for several weeks.”

In the high-tech sector, Parker sees a similar crisis playing out, with a crunch put on semiconductor supply—particularly flash memory.

“The effects are already being felt in an industry that, prior to the earthquake, was already utilizing high levels of capacity,” he said. “Apple has announced that lead times for the new iPad 2 have already been extended to seven weeks, largely due to a lack of memory components.  Having a source of reliable energy is critical to getting this industry back to running normally and there is little optimism that the nuclear issues will resolve either favorably or quickly.”

Parker noted that base materials and consumer goods were also taking a hit – due in part to failures in supply chain technology.

Simon Ellis, who currently leads the supply chain strategies practice area at IDC Manufacturing Insights, concurred:

“There has been a trend up to now, to invest in systems that would assure redundancy,” he said in an interview. “But that puts too much slack in the supply chain. Now companies have to plan for the future without getting too focused on an overwhelming rapid response to disaster.”

Ellis said that companies should not retreat from a “just-in-time” model, as inventories will become too spare.

“Preparing for normal events and mitigating risk can be done sensibly and in a cost-effective manner. We advise companies to have contingencies in place for bad weather…not 100-year storms.”

About the Author

image
Patrick Burnson
Executive Editor

Patrick Burnson is executive editor for Logistics Management and Supply Chain Management Review magazines and web sites. Patrick is a widely-published writer and editor who has spent most of his career covering international trade, global logistics, and supply chain management. He lives and works in San Francisco, providing readers with a Pacific Rim perspective on industry trends and forecasts. You can reach him directly at .(JavaScript must be enabled to view this email address).


Subscribe to Logistics Management magazine

Subscribe today. It's FREE!
Get timely insider information that you can use to better manage your
entire logistics operation.
Start your FREE subscription today!

Recent Entries

When an industry is changing rapidly, companies must adapt in order to survive. In this whitepaper, a global publisher was seeking a partner that could mitigate risk and build a platform flexible enough for their shifting customer expectations. The solution enabled the company to rewrite their operations game plan and transform their supply chain.

Global trade management technology provider Amber Road (formerly known as Management Dynamics) said this week it has acquired ecVision, a cloud-based provider of global sourcing and collaborative supply chain solutions.

While it is already reaping myriad benefits from ORION (On-Road Integrated Optimization and Navigation), a proprietary routing platform for its drivers rolled out in late 2013, transportation and logistics bellwether UPS announced big plans for the technology this week.

Diesel prices continued their recent stretch of gains with a 3.6 cent increase this week to $2.936 per gallon, according to the Department of Energy’s Energy Information Administration (EIA).

TSA has reaffirmed its March 9 general rate increase (GRI) of $600 per 40-foot container (FEU) for all shipments, and lines have also filed a previously announced April 9 GRI in the same amount.

Comments

Post a comment
Commenting is not available in this channel entry.


© Copyright 2015 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA