Subscribe to our free, weekly email newsletter!



White House looks to speed up infrastructure permitting process

By Jeff Berman, Group News Editor
May 20, 2013

The theme of leveraging infrastructure to spur economic growth was front and center in an announcement made by the White House last week.

That announcement was that President Obama will ink a Presidential Memorandum that the White House said will “modernize the Federal infrastructure permitting process, cutting timelines in half for major infrastructure projects while creating incentives for better outcomes for communities and the environment.”

The White House said in a statement that by eliminating red tape and cutting years off the time it takes to approve major infrastructure projects, construction will be able to start sooner with the subsequent benefits being the ability to create jobs earlier and more quickly fix the nation’s infrastructure. 

It also referenced President Obama’s March 2012 Executive Order for a government-wide initiative to improve the efficiency of Federal review and permitting of infrastructure projects which has since seen the expedition and permitting of 50 major projects for bridges, transit projects, railways, waterways, roads, and renewable energy.

This effort is very much in sync with the President’s infrastructure plan entitled “Rebuild America Partnership” rolled out in February that will attract private capital to build the infrastructure U.S. businesses need most.

One component of the plan is the “fix it first” policy, which he cited during February’s State of the Union address. This policy, according to the White House, calls for an investment of $50 billion towards U.S. transportation infrastructure, with $40 billion targeted to the most urgent upgrades and fixing highways, bridges, transit systems, and airports that need repair.

Speeding up the permitting process for infrastructure projects has long been a “to do” item in the Nation’s Capital. That was noted by Matt Rose, chairman and CEO of BNSF Railway at last month’s NASSTRAC Annual Conference, whom told attendees in his keynote address that the project permitting process can
take ten-to-12 years and be incredibly costly.

Fixing the nation’s infrastructure has been a core focus for the Obama administration.

And regardless of your political affiliation, there is truth in that statement. As an example, there is the American Recovery and Reinvestment Act, which provided $48 billion to more than 15,000 transportation infrastructure-related projects. Other examples cited in a fact sheet released earlier this year include:
-American workers improving more than 350,000 miles of U.S. roads and replaced more than 20,000 bridges since early 2009 through Recovery Act and core infrastructure funds; and
-the Department of Transportation has built or improved more than 6,000 miles of rail, 40 rail stations and purchased 260 passenger cars and 105 locomotives.

About the Author

Jeff Berman headshot
Jeff Berman
Group News Editor

Jeff Berman is Group News Editor for Logistics Management, Modern Materials Handling, and Supply Chain Management Review. Jeff works and lives in Cape Elizabeth, Maine, where he covers all aspects of the supply chain, logistics, freight transportation, and materials handling sectors on a daily basis. .(JavaScript must be enabled to view this email address).


Subscribe to Logistics Management magazine

Subscribe today. It's FREE!
Get timely insider information that you can use to better manage your
entire logistics operation.
Start your FREE subscription today!

Recent Entries

Intermodal units, at 278,767 containers and trailers were up 6.7 percent compared to the same week last year and marks the third best week for intermodal ever recorded based on AAR’s data.

LM Group News Editor Jeff Berman recently conducted a wide-ranging interview with Bobby Harris, President and CEO of non asset-based 3PL BlueGrace Logistics about various aspects of the freight transportation market.

It’s small, but senior brass at YRC Worldwide will take it. After nearly seven years of continuing losses in excess of $2.6 billion, the parent of the nation’s second-largest LTL carrier posted a narrow net profit in the third quarter ended Sept. 30.

As was the case for the second quarter, third quarter earnings results for publicly-traded less-than-truckload (LTL) carriers are again strong. Signs of solid earnings results from carriers that have posted earnings to date include tonnage increases, gains in weight per shipment and average daily shipments, higher yield, and revenue per hundredweight.

While the holiday season is known to bring good tidings and cheer to all, it may also come with another thing that is not so pleasant: higher rate freights. That was the thesis of a commentary written by Mark Montague, industry pricing analyst and chief market-watcher for DAT, a Portland, Ore.-based subsidiary of TransCore.

Article Topics

Blogs · All topics

Comments

Post a comment
Commenting is not available in this channel entry.


© Copyright 2013 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA