Subscribe to our free, weekly email newsletter!


Supply chain: What can supply chain executives learn from the Iceland volcano?

image
By Bob Trebilcock, Editor at Large
June 07, 2010

When the Eyjafjallajokull volcano erupted last spring, most eyes were on the airlines. Within days, a significant portion of Europe’s air space was shut down by the ash and remained grounded for weeks.

Less noticed was the impact on supply chains, says Jade Rodysill, a senior manager in Accenture’ supply chain practice. “One little volcano highlighted how tightly integrated our supply chains are around the world,” he says. And while supply chain managers today spend a great deal of time making plans to mitigate risk, Rodysill believes the real emphasis should be on bouncing back from disruptions. “Folks were shocked by just how long this event lasted,” Rodysill says. “That’s why we tell our clients that assessing and managing risk is great. But, when disruptions happen, you need the capability to snap back and make the best of it with minimal disruption.”

One example is the Dutch express mail group TNT, a company that was relatively unaffected by the volcano. When air lanes were shut down, TNT switched from its usual air hub in Belgium to another in Madrid. Some air shipments were rerouted to a European Road Network. The company kept its customers informed through the media, its website and its account teams. “TNT regularly goes through routine exercises around what it would do if there are network disruptions,” says Rodysill.

So, what can supply chain executives learn from the volcano and the response by companies like TNT? Rodysill and his colleagues at Accenture believe that the best companies will develop dynamic supply chains that build in the flexibility to adapt to sudden changes around several areas:

Sourcing: Accenture advises companies to look beyond sole-sourcing and low-cost country suppliers. That strategy includes a streamlined process for bringing on new suppliers quickly in an emergency and a diversified supplier strategy for critical materials.

Manufacturing: Along with a more diversified sourcing strategy, Accenture is advising clients to look beyond offshore production that may leave them vulnerable to international transportation disruptions. Instead, companies should create a flexible manufacturing strategy with options for building critical products in multiple locations and with fast changeover capabilities.

Product design: Accenture contends that the best strategy for a flexible supply chain begins at the design stage, with products designed to reduce complexity and leverage common platforms and parts that will reduce exposure to supply outages.

Logistics: Just like TNT, the best transportation networks are optimized for both cost and risk, and consider multiple routes to markets and contingency shipping plans.

“Most of our clients spend a lot of time thinking about the reward side of their businesses,” says Rodysill. “But the measure of a company is to be an ongoing business. You have to understand your vulnerabilities and invest some time to think through the risks and resiliency.”

About the Author

image
Bob Trebilcock
Editor at Large

Bob Trebilcock, executive editor, has covered materials handling, technology and supply chain topics for Modern Materials Handling since 1984. A graduate of Bowling Green State University, Trebilcock lives in Keene, NH. He can be reached at 603-357-0484 and .(JavaScript must be enabled to view this email address)


Subscribe to Logistics Management magazine

Subscribe today. It's FREE!
Get timely insider information that you can use to better manage your
entire logistics operation.
Start your FREE subscription today!

Recent Entries

With an eye on capitalizing on future trade and commerce growth in South Asia, express delivery and logistics services provider DHL today rolled out its plans to build an $85 million EUR ($93 million USD) DHL Express South Asia Hub, which will be a 24-hour express hub facility within the Changi Airfreight Center at the Singapore Changi Airport.

While the Federal Railroad Administration (FRA) has long stated its goal of having Positive Train Control (PTC) technology installed on 40 percent of its network by December 31, 2015, railroad industry stakeholders have repeatedly stated that reaching that deadline would be a stretch. It now appears that the railroad sector has some members of Congress sharing the same line of thought with legislation rolled out this week that pledges to extend the PTC deadline to 2020.

West Coast port authorities may be overstating the obvious when they decry “business as usual.” But it’s refreshing to see them finally coming around.

Transportation stakeholders reliant on North Carolina’s major seaports are welcoming news this week, which outlines plans to enhance the intermodal and cold chain network in the region.

The index ISM uses to measure non-manufacturing growth—known as the NMI—was 56.9 in February, which was 0.2 percent ahead of January and also 0.1 percent ahead of the 12-month average of 56.8. Economic activity in the non-manufacturing sector has grown for the last 61 months, according to ISM.

Article Topics

News · All topics

Comments

Post a comment
Commenting is not available in this channel entry.


© Copyright 2015 Peerless Media LLC, a division of EH Publishing, Inc • 111 Speen Street, Ste 200, Framingham, MA 01701 USA